News

DALE 40 – Superstructure onto the Hull

26/11/2018

“The superstructure has been dry fitted to the hull and has given us our first opportunity to see the stunning, finished, profile of the New DALE 40 – without fixtures and fittings
With the superstructure fitted one is able to feel the vast amount of internal space and volume inside – not to mention the headroom – 6’9” in some areas!

We will now remove the superstructure to for fitting out and then refit permanently in three weeks time – we will keep you posted” – Mike

Other News

Next Classic 37 Build Set to Commence

Next Classic 37 Build Set to Commence

Work is about to commence on the next DALE Classic 37, with build scheduled to commence in mid-May. Director Mike Reynolds working alongside designer Ieuan Hale to finalise the details, ensuring the boat reflects both the heritage of the classic range and the...

read more
Classic 37 Highlighted in Rough-Water Handling Feature

Classic 37 Highlighted in Rough-Water Handling Feature

Classic 37001 Iolar is featured in a two-page article in the latest issue of Motor Boat & Yachting magazine about rough-water handling in motor yachts. Written by her owner Tim Steel as part of the magazine’s Our Boats feature, the article draws on his families...

read more
Fold-Down Mast Installed on the Latest Classic 37

Fold-Down Mast Installed on the Latest Classic 37

On the current build of the Classic 37,  the installation of the custom fold-down mast is almost complete. Designed to reduce air draft when required, the system enables easier access to inland waterways and smooth passage beneath low bridges, while also simplifying...

read more

Customer Cruising Reports

Third Party Test Reports

Model Specification Sheets

Contact Us