-
Each deck fitting base is located directly onto the GRP hard surface and Paul now detailing sealant joint between Flexiteek and stainless steel stanchion base
-
James final polishing clear Awlgrip lacquer on hull topsides for that superyacht finish
-
Stainless steel skin fittings sealed into boot top line
-
Gyro stabiliser in final stages of fitment - stabiliser located on centreline on keel / base of hull and within a moulded recess in the fuel tanks for optimisation of space and efficiency
-
Overhead grounds meticulously fitted and finished - the Difference is DALE when you look behind the scenes
-
Freshwater tank and pump fitment
It’s all in the structure…
Work underway in earnest on the Classic 37006 with the structure clearly visible at this stage of the build. It's one of the aspects which makes the hull design unique, from the strengthening frames and stringers to the fuel tank design an integral part of the hull...







